Paste Backfill: How to Choose the Right Pipeline System for Underground Mining
Two years into a paste plant upgrade, a mine in the Goldfields was swapping out elbows every eleven weeks. The pipe body was fine. The problem had been locked in eighteen months earlier at a desk, by people comparing dollars per metre instead of dollars per tonne placed. That is the whole game with paste backfill pipelines. The steel is the easy part. The engineering wrapped around it is where the money is made or quietly bled away. So…